You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
Advanced Truck for High Speed Freight Operations
SBC: Sharma & Associates, Inc. Topic: N/ADuring Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...
SBIR Phase II 2004 Department of Transportation -
Low Cost Transverse Rail Defect Detector
SBC: WavesinSolids LLC Topic: N/AThis project will use an ultrasonic beam traveling logitudinally along the rail rather than the complex normal and angle-beams transducer assemblies in current systems. Detectio of transverse defects becomes a simple pulse-echo application and resolves many inherent speed, inspectin reliability and robustness problems in current rail inspection systems. The simplified procedure will increase the r ...
SBIR Phase II 2004 Department of Transportation -
Advanced Truck for High Speed Freight Operations
SBC: Sharma & Associates, Inc. Topic: 01FR1During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...
SBIR Phase II 2008 Department of Transportation