You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Advanced Truck for High Speed Freight Operations
SBC: Sharma & Associates, Inc. Topic: N/ADuring Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...
SBIR Phase II 2004 Department of Transportation -
Low Cost Transverse Rail Defect Detector
SBC: WavesinSolids LLC Topic: N/AThis project will use an ultrasonic beam traveling logitudinally along the rail rather than the complex normal and angle-beams transducer assemblies in current systems. Detectio of transverse defects becomes a simple pulse-echo application and resolves many inherent speed, inspectin reliability and robustness problems in current rail inspection systems. The simplified procedure will increase the r ...
SBIR Phase II 2004 Department of Transportation -
Ultra Portable Ride Quality Meter
SBC: DFUZION, INC. Topic: 06FR3The Ultra Portable Ride Quality Meter (UPRQM) is a cost-effective, flexible tool that can evolve (with minimal effort) as new GPS and accelerometer devices become commercially available. Each generation of these sensor devices is more responsive, more sensitive, and more accurate than the last generation. The time between generations is also decreasing such that accelerometer and GPS technology ...
SBIR Phase II 2008 Department of Transportation -
Addressing the Driving Needs of Short Stature Persons
SBC: SAFE INC Topic: 04NH1Phase I research on the development of a supplemental seating system for short stature drivers was undertaken by Safe Inc. in 2005. The purpose of Phase I was to demonstrate the feasibility of a device that would improve the ability of short stature drivers to safely operate a motor vehicle and to improve occupant crash safety. The study sought to examine the use of pedal extenders and other imp ...
SBIR Phase II 2008 Department of Transportation -
Advanced Truck for High Speed Freight Operations
SBC: Sharma & Associates, Inc. Topic: 01FR1During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...
SBIR Phase II 2008 Department of Transportation