You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. RADAR TRAFFIC MONITOR FOR INTERSECTION TRAFFIC MANAGEMENT

    SBC: Epsilon Lambda Electronics Corp.            Topic: N/A

    ROADWAY INTERSECTION TRAFFIC MANAGEMENT SYSTEMS ACCOMPLISH COMMAND AND CONTROL USING VEHICLE SENSORS WITH COMPUTERS WHICH HAVE SOPHISTICATED PROGRAMS (SOFTWEAR). COMPUTER TECHNOLOGY HAS PROGRESSED MORE RAPIDLY IN RECENT YEARS THAN SENSOR TECHNOLOGY. WIRE LOOPS WHICH ARE LAID IN THE PAVEMENT ARE COSTLY TO INSTALL AND MAINTAIN AND ARE NOT EASILY RECONFIGURED FOR AN UPGRADE OF TRAFFIC CONTROL. A RADA ...

    SBIR Phase II 1984 Department of Transportation
  2. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: N/A

    During Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...

    SBIR Phase II 2004 Department of Transportation
  3. Low Cost Transverse Rail Defect Detector

    SBC: WavesinSolids LLC            Topic: N/A

    This project will use an ultrasonic beam traveling logitudinally along the rail rather than the complex normal and angle-beams transducer assemblies in current systems. Detectio of transverse defects becomes a simple pulse-echo application and resolves many inherent speed, inspectin reliability and robustness problems in current rail inspection systems. The simplified procedure will increase the r ...

    SBIR Phase II 2004 Department of Transportation
  4. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government