You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
Advanced Truck for High Speed Freight Operations
SBC: Sharma & Associates, Inc. Topic: N/ADuring Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...
SBIR Phase II 2004 Department of Transportation -
Enhancing the Usability of an Intersection Collision Avoidance Simulation Method
SBC: Rioux Engineering Topic: 03FH2The TEXAS Model for Intersection Traffic is a high-quality single-intersection microscopic traffic simulation model developed at The University of Texas at Austin. It analyzes in sub microscopic detail the behavior of driver-vehicle units as they go through an intersection and intermix with other traffic flows. It has detailed intersection geometry, path following, microscopic car following, lan ...
SBIR Phase II 2008 Department of Transportation -
Advanced Truck for High Speed Freight Operations
SBC: Sharma & Associates, Inc. Topic: 01FR1During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...
SBIR Phase II 2008 Department of Transportation