You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
  2. A Low-Cost Portable/Wearable Device for Intelligent Stretching and Movement Training Hypertonic Forearm in Stroke with Outcome Evaluation

    SBC: Rehabtek LLC            Topic: N/A

    This project develops a wearable/portable robotic device, IntelliStretch, to perform therapeuticrehabilitation of the arm with the following three integrated steps: (1) stretching a spastic/stiff jointto its extreme position under intelligent control to loosen the stiff joint, (2) voluntary movement training using virtual reality games interfaced with assistance/resistance control when needed, and ...

    SBIR Phase II 2008 Department of Education
US Flag An Official Website of the United States Government