You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Cost, High Resolution, Pressue Mapping System for the Prevention of Pressure Ulcers

    SBC: EM PHOTONICS INC            Topic: N/A

    Pressure ulcers are a serious medical problem with annual treatment costs over $1 billion dollars. While the exact etiology involves a complex combination of factors, it is generally accepted that prolonged pressure to soft tissues results in discrete areas of acute ischemia. If the pressure is not relieved and the blood supply restored in a critical length of time, endothelial cell damage will re ...

    SBIR Phase II 2004 Department of Education
  2. Title of research project: Low Cost, Efficacious Disaster Training System and Courses for Elementary/Secondary School Personnel

    SBC: HyperGalaxy, Inc.            Topic: N/A

    Current disaster/crisis management systems are extremely rudimentary, often consisting of little more than an unorganized, hand stapled booklet containing barely pertinent information. MusePlayTM software under development by HyperGalaxy, Inc. provides an intuitive, interactive, highly visual digital content delivery environment which can serve as the perfect platform for next generation disaster ...

    SBIR Phase II 2004 Department of Education
  3. Introducing Mathematics to At-Risk Students through a 3D Role Playing Game

    SBC: PHYSITRON, INC.            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Education
  4. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: N/A

    During Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...

    SBIR Phase II 2004 Department of Transportation
  5. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
  6. A Low-Cost Portable/Wearable Device for Intelligent Stretching and Movement Training Hypertonic Forearm in Stroke with Outcome Evaluation

    SBC: REHABTEK LLC            Topic: N/A

    This project develops a wearable/portable robotic device, IntelliStretch, to perform therapeuticrehabilitation of the arm with the following three integrated steps: (1) stretching a spastic/stiff jointto its extreme position under intelligent control to loosen the stiff joint, (2) voluntary movement training using virtual reality games interfaced with assistance/resistance control when needed, and ...

    SBIR Phase II 2008 Department of Education
US Flag An Official Website of the United States Government