You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Roadway Pavement Condition Sensor

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    This Phase II SBIUR (Small Business Innovative Research) proposal is based on work accomplished by Foster-Miller, Inc. and Battelle Memorial Institute during a prior Phase I SBIR program under contract DTRS57-99-C-00090. The purpose of the Phase I program was to develop an in-vehicle sensor to measure roadway surface conditions and, from these measurements, determine the coefficient of friction b ...

    SBIR Phase II 2001 Department of Transportation
  2. Online Learning System to Advance Teaching of Hyper Molecular Modeling

    SBC: MolySym, Inc.            Topic: N/A

    MolySym has successfully prototyped and classroom tested the MolySym Hypermodeling System, a tangible user interface that provides high school chemistry students with a direct link between a physical model and a software simulation system. The incorporation of electronics and robotics technologies into ball and stick models to communicate in real time with a software simulation system is called hy ...

    SBIR Phase II 2008 Department of Education
  3. Expanding, Testing and Validating the Universal Assessment System

    SBC: Nimble Assessment Systems            Topic: N/A

    The Universal Assessment System is an innovative computer based test delivery system that applies principles of Universal Design for Learning to flexibly meet the accessibility and accommodation needs of individual students with disabilities in grades 3 to 12. Flexibly meeting individual needs is accomplished by allowing teachers to activate one or more of the accessibility and accommodation tool, ...

    SBIR Phase II 2008 Department of Education
  4. The Digital Earth Explorations Project (DEEP)

    SBC: One Planet Education, LLC            Topic: N/A

    OPENs SBIR proposal will develop then research the potential of a branded game based curriculum designed to foster interdisciplinary knowledge in the sciences, social studies, language arts, and mathematics. By connecting that content to real world applications, locations, and professional organizations we intend to instill an appreciation for the value of disciplinary educational content for adv ...

    SBIR Phase II 2008 Department of Education
  5. A Low-Cost Portable/Wearable Device for Intelligent Stretching and Movement Training Hypertonic Forearm in Stroke with Outcome Evaluation

    SBC: Rehabtek LLC            Topic: N/A

    This project develops a wearable/portable robotic device, IntelliStretch, to perform therapeuticrehabilitation of the arm with the following three integrated steps: (1) stretching a spastic/stiff jointto its extreme position under intelligent control to loosen the stiff joint, (2) voluntary movement training using virtual reality games interfaced with assistance/resistance control when needed, and ...

    SBIR Phase II 2008 Department of Education
  6. Wireless Brake Shoe Force Measurement System

    SBC: Mide Technology Corporation            Topic: 04FR1

    Railroad freight car safety and maintenance cost is directly related to knowledge of the actual braking force provided by a brake shoe. If the brake force is too low, safety is at risk. If the brake shoe is replaced before the end of it's lifetime to ensure safety, maintenance and thus operating costs are increased. Currently there is no system in place to monitor brake shoe force during train ...

    SBIR Phase II 2008 Department of Transportation
  7. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government