You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. PDA-Based Portable Data Collection System for Commercial Vehicle Inspection

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: 02FM1

    More than 1,300,000 Level 1 commercial vehicle inspections - a safety-critical, time-consuming, often difficult and painstaking process, especially as regards the brake inspection component -- are performed every year in the United States, under all sorts of weather and lighting conditions. The current technology used adds to the complexity and error potential inherent in this important task. In ...

    SBIR Phase II 2008 Department of Transportation
  2. N/A

    SBC: Sharma & Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of Transportation
  3. Development of an Audio/Tactile Atlas of the World for Use by Students who are Blind or Visually Impaired

    SBC: TOUCH GRAPHICS, INC.            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Education
  4. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
  5. A Low-Cost Portable/Wearable Device for Intelligent Stretching and Movement Training Hypertonic Forearm in Stroke with Outcome Evaluation

    SBC: REHABTEK LLC            Topic: N/A

    This project develops a wearable/portable robotic device, IntelliStretch, to perform therapeuticrehabilitation of the arm with the following three integrated steps: (1) stretching a spastic/stiff jointto its extreme position under intelligent control to loosen the stiff joint, (2) voluntary movement training using virtual reality games interfaced with assistance/resistance control when needed, and ...

    SBIR Phase II 2008 Department of Education
US Flag An Official Website of the United States Government