You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. A Low-Cost, High-Performance Physical Activity Monitor (PAM)

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Education
  2. On-Line Resources for Teaching Higher-Order Reading and Comprehension Skills

    SBC: Language Analysis Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Education
  3. A Low-Cost Portable/Wearable Device for Intelligent Stretching and Movement Training Hypertonic Forearm in Stroke with Outcome Evaluation

    SBC: Rehabtek LLC            Topic: N/A

    This project develops a wearable/portable robotic device, IntelliStretch, to perform therapeuticrehabilitation of the arm with the following three integrated steps: (1) stretching a spastic/stiff jointto its extreme position under intelligent control to loosen the stiff joint, (2) voluntary movement training using virtual reality games interfaced with assistance/resistance control when needed, and ...

    SBIR Phase II 2008 Department of Education
  4. Audio Based Instructional Video Indexing and Retrieval

    SBC: SIGMA SYSTEMS RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Education
  5. Ultra Portable Ride Quality Meter

    SBC: DFUZION, INC.            Topic: 06FR3

    The Ultra Portable Ride Quality Meter (UPRQM) is a cost-effective, flexible tool that can evolve (with minimal effort) as new GPS and accelerometer devices become commercially available. Each generation of these sensor devices is more responsive, more sensitive, and more accurate than the last generation. The time between generations is also decreasing such that accelerometer and GPS technology ...

    SBIR Phase II 2008 Department of Transportation
  6. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government