You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMPUTER-BASED PAVEMENT DISTRESS IDENTIFICATION SYSTEM

    SBC: Eres Consultants Inc.            Topic: N/A

    PAVEMENT DISTRESS DATA ARE UTILIZED DURING PAVEMENT EVALUATION, DESIGN, REHABILITATION, MAINTENANCE, MANAGEMENT, AND RESEARCH. CURRENTLY, THE MANUAL SURVEY METHOD, UTILIZING PAPER AND PENCIL, IS USED EXTENSIVELY IN COLLECTING THE DISTRESS DATA, BUT THIS PROCESS IS SLOW, TEDIOUS, EXPENSIVE, AND PRONE TO HUMAN ERROR. THE OBJECTIVE OF THIS RESEARCH IS TO DEVELOP A COMPUTERIZED PAVEMENT DISTRESS DATA ...

    SBIR Phase II 1995 Department of Transportation
  2. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
  3. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government