You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Low Conductivity for Thermal Barrier Coatings (TBCs)
SBC: APPLIED THIN FILMS, INC Topic: N/AHigher inlet temperatures for turbine engines will provide significant benefits in fuel efficiency and performance for both military and commercial air vehicles. To accomplish this goal, new generation thermal barrier coatings (TBCs) with superiorreliability and durability will be needed. The currently-used zirconia-based TBCs do not adequately meet thermal conductivity requirements and they suf ...
SBIR Phase II 2001 Department of DefenseArmy -
CMAS mitigation for TBCs using a novel aluminum-phosphate based overlay coating
SBC: APPLIED THIN FILMS, INC Topic: N06032Environmental degradation of aerospace turbine components is a major concern for aircraft and power generation systems, and various surface treatments are utilized to extend the lifetimes of these critical components. This Phase II project is targeted toward extending the durability of thermal barrier coatings (TBCs) on hot section turbine components. TBCs are highly susceptible to degradation b ...
SBIR Phase II 2008 Department of DefenseNavy -
MONOLITHIC GAAS LIGHT-EMITTING DIODES ON SILICON VLSI CIRCUITS ELEMENTS
SBC: ASTROPOWER, INC. Topic: N/AOPTOELECTRONIC SOURCES, INTEGRATED AS MONOLITHIC ELEMENTS ON SILICON VLSI CHIPS, OFFER IMPORTANT ADVANTAGES IN THE TRANSMISSION OF INFORMATION WITHIN THE CHIP OR BETWEEN CHIPS IN ADVANCED COMPUTER SYSTEMS. THE SPEED OF OPTICAL-INTEGRATED VLSI DEVICES IS EXPECTED TO BE CONSIDERABLY HIGHER THAN EQUIVALENT VLSI WITH METALLIC INTERCONNECTS, DUE TO ABSENCE OF THE RC DELAY INHERENT IN THE METALLIC CONDU ...
SBIR Phase II 1987 Department of DefenseDefense Advanced Research Projects Agency -
HIGH-EFFICIENCY THIN-FILM SILICON-ON-GAP SOLAR CELL FOR IMPROVED RADIATION RESISTANCE
SBC: ASTROPOWER, INC. Topic: N/ATHE ULTIMATE HIGH-EFFICIENCY CRYSTALLINE SILICON SOLAR CELL DESIGN CONSISTS OF A THIN FILM OF ELECTRICALLY-ACTIVE SILICON EPITAXIALLY GROWN ON AN OXIDE-OVERCOATED, INFRARED-TRANSPARENT GALLIUM PHOSPHIDE (GAP) SUBSTRATE. IN ADDITION TO HIGH CONVERSION EFFICIENCY AND INTRINSIC RADIATION RESISTANCE DUE TO THE THIN ACTIVE LAYERS, THIS NOVEL DESIGN HAS SEVERAL UNIQUE PERFORMANCE ENHANCING FEATURES. THE ...
SBIR Phase II 1987 Department of DefenseAir Force -
High Sensitivity Rugged Array Detectors for Field Deployed Instruments: Low-Light Level Camera for Laser-Induced Breakdown Spectroscopy (LIBS) and Ram
SBC: B & W TEK INC Topic: A06065Laser-induced breakdown spectroscopy (LIBS) and Raman spectroscopy are developing rapidly for chemical and biochemical sensing applications. There is an urgent need for high-sensitivity detectors so as to minimize sample quantity and maximize detection range from the source. In most field-deployable spectrometers, a photo-detector array is used for analyzing the spectral contents. The sensitivitie ...
SBIR Phase II 2008 Department of DefenseArmy -
Intersensor Information Assurance
SBC: BIO-IMAGING RESEARCH, INC. Topic: N/AWe propose to design, fabricate, and test a novel x-ray detector for use in industrial CT scanners. This linear detector array combines high spatial resolution and long array length to achieve high-resolution scans on large objects. We propose to supplyan x-ray scanner to the Army Research Laboratory for non-destructive testing that includes this linear array with a commercial flat-panel area de ...
SBIR Phase II 2001 Department of DefenseOffice of the Secretary of Defense -
Web-Scale Search-based Data Extraction and Integration: Geospatial Database Generation Agents-- Phase II
SBC: CAZOODLE, INC. Topic: A07124This proposal addresses topic A07-124 ``Geospatial Database Generation Agents'' aiming at developing the technology to populate the geometry and attribution of geospatial databases with information mined from open source text, tables, and non-spatial databases on the Web. As our solution, we propose to build the GeoEngine, a ``vertical-search'' system for finding and ranking information about geos ...
SBIR Phase II 2008 Department of DefenseArmy -
Advanced Chemical Iodine Lasers for the ABL
SBC: CU AEROSPACE L.L.C. Topic: N/AThe primary objective of CU Aerospace's Phase II work will be to experimentally characterize the ElectriCOIL flow using advanced diagnostics and to demonstrate lasing of this electrically assisted chemical iodine laser. CU Aerospace (CUA) and theUniversity of Illinois at Urbana-Champaign (UIUC) believe that it is possible to construct a highly efficient electric generation scheme to provide the pr ...
SBIR Phase II 2001 Department of DefenseAir Force -
Antenna to Antenna Coupling and Electromagnetic Interference (EMI) Tool for Air Platforms.
SBC: DELCROSS TECHNOLOGIES, LLC Topic: N07012One of the most important problems encountered in an electromagnetic environment is that of providing compatibility between radiating and receiving RF equipment within the environment. This problem is a type of EMI and the goal of RF system designers and analysts is to achieve EMC where no interference problems exist. We propose to develop a software tool named Electromagnetic Interference Toolki ...
SBIR Phase II 2008 Department of DefenseNavy -
RF Sensor Performance in Electrically Large, Complex Environments
SBC: DELCROSS TECHNOLOGIES, LLC Topic: N07023Modern aircraft include numerous RF systems and associated antennas of diverse types. The designed performance of antennas is typically degraded by their installation on the airframe. Also, the presence of many RF systems in a small region creates enormous opportunity for undesired interference via antenna-to-antenna coupling. These conditions present serious challenges for engineers tasked with i ...
SBIR Phase II 2008 Department of DefenseNavy