You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Self-Contained Sub Centimeter Positioning Platform
SBC: TRUNAV LLC Topic: 812NThe goal of this project is to develop, prototype, and experimentally validate a new Differential Global Navigation Satellite System (DGNSS) capable of providing sub-centimeter positioning accuracy for quasi-static scientific, survey, and structural health monitoring application. The main feature of the proposed DGNSS solution is that it leverages publically available GNSS reference data from exis ...
SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration -
Environmental Pavement Monitor
SBC: AVS US INC Topic: 07FH3With infrastructure costs escalating it is becoming essential to monitor the health of asphalt and concrete pavement so that timely maintenance can maximize their usefulness. This SBIR will develop a sensor that can be embedded within concrete or asphalt, which can measure moisture, temperature, stress and strain. It will provide critical data for evaluating pavement performance starting with th ...
SBIR Phase II 2009 Department of Transportation -
PDA-Based Portable Data Collection System for Commercial Vehicle Inspection
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 02FM1More than 1,300,000 Level 1 commercial vehicle inspections - a safety-critical, time-consuming, often difficult and painstaking process, especially as regards the brake inspection component -- are performed every year in the United States, under all sorts of weather and lighting conditions. The current technology used adds to the complexity and error potential inherent in this important task. In ...
SBIR Phase II 2008 Department of Transportation -
Advanced Truck for High Speed Freight Operations
SBC: Sharma & Associates, Inc. Topic: 01FR1During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...
SBIR Phase II 2008 Department of Transportation