You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Small Scale Ethanol Drying

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: N/A

    This program exceeded all key milestones. Using cellulose Waste, CMS demonstrated novel ethanol drying membranes via small scale dephlegmation process that yields fuel grade ethanol (FGE) at a lower cost than large switch grass ethanol plants. This success yields positive value for cellulose waste. We achieved targeted EPA goals of developing low cost environmentally friendly systems to enhance re ...

    SBIR Phase II 2008 Environmental Protection Agency
  2. COMPUTER-BASED PAVEMENT DISTRESS IDENTIFICATION SYSTEM

    SBC: Eres Consultants Inc.            Topic: N/A

    PAVEMENT DISTRESS DATA ARE UTILIZED DURING PAVEMENT EVALUATION, DESIGN, REHABILITATION, MAINTENANCE, MANAGEMENT, AND RESEARCH. CURRENTLY, THE MANUAL SURVEY METHOD, UTILIZING PAPER AND PENCIL, IS USED EXTENSIVELY IN COLLECTING THE DISTRESS DATA, BUT THIS PROCESS IS SLOW, TEDIOUS, EXPENSIVE, AND PRONE TO HUMAN ERROR. THE OBJECTIVE OF THIS RESEARCH IS TO DEVELOP A COMPUTERIZED PAVEMENT DISTRESS DATA ...

    SBIR Phase II 1995 Department of Transportation
  3. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
  4. Small Scale Ethanol Drying

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 07NCERP1

    This program exceeded all key milestones. Using cellulose Waste, CMS demonstrated novel ethanol drying membranes via small scale dephlegmation process that yields fuel grade ethanol (FGE) at a lower cost than large switch grass ethanol plants. This success yields positive value for cellulose waste. We achieved targeted EPA goals of developing low cost environmentally friendly systems to enhance re ...

    SBIR Phase II 2008 Environmental Protection Agency
  5. Self-Contained Sub Centimeter Positioning Platform

    SBC: TRUNAV LLC            Topic: 812N

    The goal of this project is to develop, prototype, and experimentally validate a new Differential Global Navigation Satellite System (DGNSS) capable of providing sub-centimeter positioning accuracy for quasi-static scientific, survey, and structural health monitoring application. The main feature of the proposed DGNSS solution is that it leverages publically available GNSS reference data from exis ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
US Flag An Official Website of the United States Government