You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Intersensor Information Assurance
SBC: BIO-IMAGING RESEARCH, INC. Topic: N/AWe propose to design, fabricate, and test a novel x-ray detector for use in industrial CT scanners. This linear detector array combines high spatial resolution and long array length to achieve high-resolution scans on large objects. We propose to supplyan x-ray scanner to the Army Research Laboratory for non-destructive testing that includes this linear array with a commercial flat-panel area de ...
SBIR Phase II 2001 Department of DefenseOffice of the Secretary of Defense -
Development of Fiber Optic Approach Lighting Systems Part One: Development of LED Threshold Lights
SBC: Lighting Innovations, LLC Topic: N/AThe incandescent lamps used in the green threshold lamps that form a line on the front end of an airport runway, have relatively short lives and require constant maintenance. The green filters used in front of the lamps transmit only about 20% of the light. Green light emitting diodes (LEDs) have been improved recently and are reaching brightness levels making it possible to use them in traffic ...
SBIR Phase II 2001 Department of Transportation -
Development of Fiber Optic Approach Lighting Systems Part One: Development of LED Threshold Lights
SBC: Lighting Innovations, LLC Topic: N/AThe incandescent lamps used in the green threshold lamps that form a line on the front end of an airport runway, have relatively short lives and require constant maintenance. The green filters used in front of the lamps transmit only about 20% of the light. Green light emitting diodes (LEDs) have been improved recently and are reaching brightness levels making it possible to use them in traffic ...
SBIR Phase II 2001 Department of Transportation -
Advanced Truck for High Speed Freight Operations
SBC: Sharma & Associates, Inc. Topic: N/ADuring Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...
SBIR Phase II 2004 Department of Transportation -
Advanced Truck for High Speed Freight Operations
SBC: Sharma & Associates, Inc. Topic: 01FR1During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...
SBIR Phase II 2008 Department of Transportation -
Self-Contained Sub Centimeter Positioning Platform
SBC: TRUNAV LLC Topic: 812NThe goal of this project is to develop, prototype, and experimentally validate a new Differential Global Navigation Satellite System (DGNSS) capable of providing sub-centimeter positioning accuracy for quasi-static scientific, survey, and structural health monitoring application. The main feature of the proposed DGNSS solution is that it leverages publically available GNSS reference data from exis ...
SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration -
Countermeasures to Covert Access Methods to Reduce Attack Susceptibility and Ensure Trust
SBC: EDAPTIVE COMPUTING INC Topic: OSD09IA2ABSTRACT:Sophisticated methods for infiltrating and compromising computer systems have continuously demonstrated their ability to defeat current operating system and network defenses. Computing assets such as the BIOS, hardware device drivers, and COTS hardware from non-trusted supply chains have been proven to include malware and/or Trojan horse applications. These subversive software programs pr ...
SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense -
Increasing the Specific Power of Epitaxial Lift-Off Solar Cells for Cost-Effective, High-Efficiency, Flexible Photovoltaics
SBC: MICROLINK DEVICES INC Topic: OSD13EP3Photovoltaics (solar cells) are an attractive technology to provide renewable energy sources for forward operating bases, man-portable power sources, and tactical applications. Solar arrays can provide base power greatly reducing the need for logistical fuels, continuous battery recharging for warfighters on the move, and integrated power sources for remote, autonomous systems, e.g. UAVs. To be ef ...
SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense -
Deep Analytics for Data in Cyber-Physical Systems
SBC: EDAPTIVE COMPUTING INC Topic: OSD13LD1Our proposal specifically addresses the stated requirements of the solicitation; we will develop and deploy tools, methods, and models for improving collaboration between human and cyber-physical systems. The proposed HARVEST Phase II solution builds on previous Edaptive Computing, IncInc. (ECI) knowledge and technology itself innovative to create a knowledge discovery system which extracts and ...
SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense -
High Power Density SOFC Stack
SBC: NEXTECH MATERIALS, LTD. Topic: OSD13EP4Small unmanned aerial systems (S-UAS), unmanned ground systems (UGS), vehicle auxiliary power units (APU), and mobile power generation units require high efficiency power systems capable of operating on logistically available fuels (JP-8, diesel) to enable long endurance operation.In particular, S-UASs in the Group 2 (2155 lbs)/Group 3 ( 150 cm2 active area) in the Phase I and then to the stack le ...
SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense