You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
  2. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    SBC: Sharma & Associates, Inc.            Topic: 151FR1

    The Next Generation Equipment Committee (NGEC) developed a standard for specifying the use of an Ethernet based digital train line (DTL) network to replace the COMM line for passenger trains. These specifications are PRIIA 305‐919 Digital Train Line Hardware and PRIIA 305‐920 Digital Train Line Software. The intent Is to eventually allow for the improvement of passenger train control. DTL spec ...

    SBIR Phase II 2017 Department of Transportation
US Flag An Official Website of the United States Government