You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Intelligent Dimension Evaluation and Alerting System (IDEAS)
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 111FH3Low or narrow bridges are often hit by legal-sized commercial vehicles and oversize vehicles often strike regulation bridges. In both cases the accidents result in extensive property damage, possible personal injuries and even death, and increased traffic congestion. Past attempts to warn drivers of risks for bridge hits have failed due to inaccurate measurement, high rates of false alarms, or s ...
SBIR Phase II 2012 Department of Transportation -
Transportation Autonomous Device
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 101FR4Job related injuries cost the railroads over $1 billion annually and from 2005 through 2008 30.3% of those injuries occurred in the rail yard. A majority of the accidents were attributed to slips, trips and falls from the worker slipping on ballast or tripping on other trackside objects. IEM is developing a Transportation Autonomous Device that may be configured to work autonomously, with a remote ...
SBIR Phase II 2012 Department of Transportation -
"Advanced Application of EMATs in Rail Inspection"
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: N/AN/A
SBIR Phase II 1997 Department of Transportation -
Real Time Signal State Transition Software for ATC- NTCIP Interface
SBC: Advanced Technologies, Inc Topic: 06FH1Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...
SBIR Phase II 2012 Department of Transportation -
PDA-Based Portable Data Collection System for Commercial Vehicle Inspection
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 02FM1More than 1,300,000 Level 1 commercial vehicle inspections - a safety-critical, time-consuming, often difficult and painstaking process, especially as regards the brake inspection component -- are performed every year in the United States, under all sorts of weather and lighting conditions. The current technology used adds to the complexity and error potential inherent in this important task. In ...
SBIR Phase II 2008 Department of Transportation