You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Network Survivability, Recovery & Reconstitution (NS2R)

    SBC: Centripetal Networks, Inc.            Topic: HSB0102003

    Centripetal Networks, Inc. (CNI) will research and develop a Network Protection System (NPS) capable of providing a Network Survivability, Recovery, and Reconstitution (NS2R) service requested by the Department of Homeland Security (DHS). NS2R will help the DHS achieve its mission to secure, protect, and defend US Internet infrastructure. This NPS builds on CNI's successful completion of the SBIR ...

    SBIR Phase II 2011 Department of Homeland Security
  2. Portable Active Thermographic Coating Inspection System

    SBC: Fuchs Consulting Inc            Topic: 091FH2

    This proposal seeks to produce a unique thermographic coating inspection system that is customized for the inspection of bridge coatings. The system uses active thermography where IR sources are used to provide controlled heating to a coating system. The presence of a defect in a coating system will result in differences in heat flow, which can be imaged with an infrared camera. An off-the-shel ...

    SBIR Phase II 2011 Department of Transportation
  3. Microscopic Traffic Flow Simulation Models- An Open Source Approach

    SBC: NEW GLOBAL SYSTEMS FOR INTELLIGENT TRANSPORTATION MANAGEMENT CORPORATION            Topic: 081FH5

    PHASE II TECHNICAL OBJECTIVE The major objective of this Phase II proposal is to establish open source traffic simulation model and software, and to develop application programming interfaces to accommodate future traffic research needs. Objectives will be accomplished by building and demonstrating FOMM, an open source traffic simulation model and software. Furthermore, to accommodate future resea ...

    SBIR Phase II 2011 Department of Transportation
  4. Solar Roadways

    SBC: SOLAR ROADWAYS INCORPORATED            Topic: 091FH5

    As stated in the solicitation, the pavement infrastructure in the US covers a large surface area and requires intensive energy and natural resources. In addition, the surface of the pavement is typically impermeable, causing negative consequences. Vehicles that travel over these pavements are also resource intensive. Solar Roadways Incorporated envisions replacing current asphalt surfaces with m ...

    SBIR Phase II 2011 Department of Transportation
  5. Traffic Intersection Simulation of IntelliDrive, J2735, and DSRC/WAVE with eTEXAS

    SBC: HARMONIA HOLDINGS GROUP, LLC            Topic: 101FH3

    We accelerate the maturity of IntelliDrive applications and unlock the storehouse of modeling detail in TEXAS to organizations building IntelliDrive applications J2735/Dedicated Short Range Communication (DSRC) signal controllers and on-board IntelliDrive systems. We add four SAE J2735 messages: SPAT MapData Basic Safety Messages and Signal Request Message for emergency vehicle preemption. Mapping ...

    SBIR Phase II 2011 Department of Transportation
  6. Manufacturing of a low-cost, high efficiency, solid-state neutron detector

    SBC: HY-Tech Research Corp.            Topic: HSB071009

    The main objective of this DNDO SBIR-funded effort is to enable large-scale and economical production of high-sensitivity, solid-state, thermal neutron detectors for use in radiological inspection. The Phase I project successfully demonstrated a novel, energetic ion technique for depositing the active material, boron-10, onto the patterned silicon, which forms the substrate for the device. Micron- ...

    SBIR Phase II 2008 Department of Homeland Security
  7. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  8. Low Power Compact Integrated Neutron Detector

    SBC: Trojan Defense LLC            Topic: N/A

    This SBIR focuses primarily on monitoring intermodal sea containers. The proposed solid-state detector is also suitable for other deployments, including embed in cell phones for a widely dispersed distributed detection network, or in planned devices such as the Intelligent Personal Radiation Locator. Furthermore other conveyances such as passenger and cargo planes, over-the-road trailers and rail ...

    SBIR Phase II 2008 Department of Homeland Security
  9. Ultra Portable Ride Quality Meter

    SBC: DFUZION, INC.            Topic: 06FR3

    The Ultra Portable Ride Quality Meter (UPRQM) is a cost-effective, flexible tool that can evolve (with minimal effort) as new GPS and accelerometer devices become commercially available. Each generation of these sensor devices is more responsive, more sensitive, and more accurate than the last generation. The time between generations is also decreasing such that accelerometer and GPS technology ...

    SBIR Phase II 2008 Department of Transportation
  10. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government