You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Transportation System Performance Measurement Using Existing Loop Infrastructure

    SBC: CLR ANALYTICS INC            Topic: 102FH2

    With continuing emphasis on transportation sustainability and fiscal stewardship, utilizing existing loop detector infrastructure to obtain more accurate, reliable and comprehensive traffic system performance measures is desired by many transportation agencies. In Phase I study, we found that the capability of the Inductive Loop Detector (ILD) signature technology to re-identify and classify vehic ...

    SBIR Phase II 2013 Department of Transportation
  2. Smartphone Signal Alert Status

    SBC: Savari Inc.            Topic: 111FH1

    The primary objective for Phase I was to design and develop a proof of concept system demonstrating the basic functionality and feasibility to deploy technology in the field. During the six-month effort, a detailed Concept of Operations document was prepared that served as a foundation for the design and development of the SmartCross system. The core components of the system: (a) Smartphone applic ...

    SBIR Phase II 2013 Department of Transportation
  3. Augmenting Inductive Loop Vehicle Sensor Data with SPAT and GrID (MAP) via Data Fusion

    SBC: Savari Inc.            Topic: 111FH2

    In this proposal, we have proposed a program for twenty months to build on the basic ideas and feasibility developed in Phase I of this SBIR in order to demonstrate the practical use of DSRC technologies with signal controller for adaptive timing with a goal towards commercialization. Specifically, we intend to further develop, build and integrate advanced signal control algorithms that make use o ...

    SBIR Phase II 2013 Department of Transportation
US Flag An Official Website of the United States Government