You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Cost Bridge Structural Monitoring Technology / Turning Structural Monitoring Data into Decision Making Information

    SBC: Intelligent Automation, Inc.            Topic: 081FH6

    This is a supplemental Phase II proposal submitted to DOT for additional funding and performance period extension of the on-going DOT Phase II project (contract # DTRT57-10-C-10027). The overall objective of the Supplemental Phase II effort is to complete the development of the sensor system capable of continuously monitoring the integrity of bridge structures, conduct field operation validation ...

    SBIR Phase II 2013 Department of Transportation
  2. Communicating Towed unit (Trailer) Vehicle Identification Number(s) (VIN) to the Powered Unit

    SBC: Intelligent Automation, Inc.            Topic: 121FM1

    Usually the lifetime of a trailer is much longer than tractors; tractors must work with a variety types and ages of trailers over the course of their use. In many scenarios (e.g., roadside inspection, border crossing, smart parking, connected vehicle initiative, etc.), it is necessary to identify trailer(s)' VIN(s) and know their sequences attached to the powered unit. An automated trailer VIN id ...

    SBIR Phase II 2013 Department of Transportation
  3. Very High Speed Third Rail Insulator Cleaning

    SBC: MINI, LLC            Topic: 07FT4

    This Phase IIB proposal will accelerate the commercialization of the Phase II project that developed the Vohrtex insulator cleaner. The Phase II cleaner used self-spinning nozzles which require oversized offset jets to provide sufficient reaction force to make the nozzle spin. The oversized jets damage the surface finish of the insulators. This Phase IIB project will use small pneumatic, electric ...

    SBIR Phase II 2013 Department of Transportation
  4. Step Frequency Ground Penetrating Radar for Location and Evaluation of In-Roadway Sensors

    SBC: STARODUB INC            Topic: 06FH2

    A nondestructive evaluation method is proposed for imaging in-roadway sensors, anticipated to allow them to be located and evaluated in-situ. The techniques uses innovative step frequency GPR hardware together with new data collection and data processing methods to provide high-resolution images of in-roadway sensor features. Recent work by the proposed research team has already demonstrated im ...

    SBIR Phase II 2008 Department of Transportation
  5. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
  6. Aircraft Wiring Integrity Verification using Pseudo-Random Binary Sequence

    SBC: Intelligent Automation, Inc.            Topic: N/A

    Our approach to aircraft wiring inspection is to inject a special type of low level probe signal into the cable to be tested. The system response to this special input can be used to give the complete transfer function of the cable. Incipient failures in the cable will be detectable as subtle changes in that transfer function, or cross-correlation between probe input signal and response, includi ...

    SBIR Phase II 2002 Department of Transportation
  7. Development and Testing of a Pedestrian Alert System

    SBC: OPTIMUS Corporation            Topic: N/A

    The project involves the final design, development, and testing of system designed to alert a driver to an impending pedestrian crash. A PAS was designed to mitigate a primary crash cause by enhancing the motorist¿s capability to detect pedestrians. Phase I showed that the PAS concept will provide all weather operation, non-LOS operation around visual screens, pedestrian detection at close an ...

    SBIR Phase II 2002 Department of Transportation
  8. A System for Automated Analysis of Driver Glance Videos

    SBC: IMAGECORP, INC.            Topic: N/A

    ImageCorp, Inc. and its subcontractor M-Vision, Inc. propose to design and conduct a feasibility study of a machine vision system dedicated to the automatic analysis of the drivers¿ glancing direction. This system will be able to determine the beginning and end of the glancing activity in the video sequence, indexed by the subject (functional area of interest), duration, and direction of glance. ...

    SBIR Phase II 2001 Department of Transportation
US Flag An Official Website of the United States Government