You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Artificial Intelligence Hybrid Range Scheduler

    SBC: QUANTUM LEAP INNOVATIONS, INC.            Topic: N/A

    Scheduling is a complex, NP-hard problem that challenges the use of any single solution technique. In Phase I, we built a model that uses our multi-technique Quantum Leap Problem Solving Engine to solve a representative but simplified version of the AirForce Satellite Control Network (AFSCN) contact scheduling problem. The system demonstrated that it could schedule the hundreds (500 to 600) of t ...

    SBIR Phase II 2001 Department of DefenseAir Force
  2. Improved Radio Frequency (RF) Polymer Substrates for Antennas

    SBC: SPECTRUM MAGNETICS LLC            Topic: AF071134

    Based on multiple technology platforms and theoretical analyses, in the Phase I program we have demonstrated the feasibility that RF polymers with desirable high frequency properties can be achieved. Following Edison¡¯s model of product and process development for technology innovations, Phase-II will pursue further incremental improvement in material properties upon the concept-proving materi ...

    SBIR Phase II 2008 Department of DefenseAir Force
  3. Microscopic Traffic Flow Simulation Models- An Open Source Approach

    SBC: NEW GLOBAL SYSTEMS FOR INTELLIGENT TRANSPORTATION MANAGEMENT CORPORATION            Topic: 081FH5

    PHASE II TECHNICAL OBJECTIVE The major objective of this Phase II proposal is to establish open source traffic simulation model and software, and to develop application programming interfaces to accommodate future traffic research needs. Objectives will be accomplished by building and demonstrating FOMM, an open source traffic simulation model and software. Furthermore, to accommodate future resea ...

    SBIR Phase II 2011 Department of Transportation
  4. Ultrahigh Definition Microdisplay (UDM)

    SBC: ALCES Technology, Inc.            Topic: AF093021

    ABSTRACT: Alces Technology has developed a novel 1D scanned linear array MEMS microdisplay capable of 8 megapixel images and beyond. In combination with recent developments in semiconductor laser light sources, the Alces Microdisplay provides a low-cost, scalable approach to fulfilling existing and future requirements for UDMs in HMD systems. Combining the Alces Microdisplay with waveguide optics ...

    SBIR Phase II 2011 Department of DefenseAir Force
US Flag An Official Website of the United States Government