You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation -
Compact Laser Shearography System for Crack Detection
SBC: Laser Technology Inc. Topic: 05FH1Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...
SBIR Phase II 2008 Department of Transportation -
Microscopic Traffic Flow Simulation Models- An Open Source Approach
SBC: NEW GLOBAL SYSTEMS FOR INTELLIGENT TRANSPORTATION MANAGEMENT CORPORATION Topic: 081FH5PHASE II TECHNICAL OBJECTIVE The major objective of this Phase II proposal is to establish open source traffic simulation model and software, and to develop application programming interfaces to accommodate future traffic research needs. Objectives will be accomplished by building and demonstrating FOMM, an open source traffic simulation model and software. Furthermore, to accommodate future resea ...
SBIR Phase II 2011 Department of Transportation -
Climate Information Management Toolkit
SBC: Riverside Technologies Inc. Topic: 822The SBIR solicitation expressed the need for tools to process data from disparate sources in various formats and generate drought-relevant data products. NIDIS also recognizes a need to span organizational boundaries to provide access to integrated drought information for use in water management. The Phase I SBIR project resulted in prototype Climate Information Management Toolkit (CIMT) software ...
SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration -
Aerosol Particle Spectrometer with Depolarization and Fluorescence
SBC: Droplet Measurement Technologies, LLC Topic: 822An operational optical particle counter will be built, extensively characterized and evaluated that measures the size and shape of aerosol particles with optical diameter from 0.1 to 10 μm. This instrument will distinguish different species of dust and volcanic ash from other types of aerosol particles, and provide an estimate of the aerosol optical properties and produce compositional informati ...
SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration -
Low Cost Transverse Rail Defect Detector
SBC: Mide Technology Corporation Topic: 02FR1Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...
SBIR Phase II 2008 Department of Transportation