You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DEVELOPMENT OF AN ADVANCED FAN BLADE CONTAINMENT SYSTEM
SBC: Advanced Structures Technology Topic: N/AAN ADVANCED TURBINE ENGINE FAN BLADE CONTAINMENT SYSTEM USING CERAMIC TILES ON A POLYMER FIBER BACKING RING IS PRO- POSED. THE PROPOSED CERAMIC/POLYMER-FIBER SYSTEM HAS PROVEN MORE WEIGHT EFFECTIVE THAN MONOLITHIC METALLIC OR POLYMER MATERIALS FOR STOPPING PENETRATION OF BALLISTIC MUNITIONS PROJECTILES. IT IS EXPECTED THAT THIS TECHNOLOGY, ORIGINAL-LY DEVELOPED FOR AIRCRAFT ARMOR SYSTEMS, WILL DEC ...
SBIR Phase II 1989 Department of Transportation -
PipeTaz: Automated Pipe Asbestos Insulation Removal and Processing System
SBC: AUTOMATIKA, INC. Topic: N/A60104 Asbestos abatement costs, associated with the DOE¿s national weapons¿ complex clean-up efforts, may amount to $300-500 million, while nationally, asbestos abatement may cost more than $100 billion over the next 25 years. Abatement methods have changed little in the past 20 years, and there is a need for a cheaper, faster, and safer abatement method. This project will design, buil ...
SBIR Phase II 2001 Department of Energy -
A NOVEL, LOW COST SYSTEM FOR AUTOMATED DNA SEQUENCE READING
SBC: Bioautomation Associates Topic: N/ATWO TYPES OF INSTRUMENT ARE EMERGING FOR THE AUTOMATED MEASUREMENT OF DNA. ONE USES FLUORESCENT LABELING AND DETECTION IN THE GEL. THE OTHER USES RADIOACTIVE LABELING AND DETECTION FROM AN AUTORADIOGRAM. INNOVATIONS SUCH AS MULTIPLEX SEQUENCING SUGGEST THAT BOTH TECHNIQUES WILL BE USED IN YEARS TO COME FOR BOTH MAPPING AND SEQUENCING. INSTRUMENTATION FOR THE TWO APPROACHES HAS BEEN SOPHISTICATED A ...
SBIR Phase II 1989 Department of Energy -
USE OF AN AIR-COOLED CYCLONE COAL COMBUSTOR TO CONVERT ASH TO INERT SLAG
SBC: Coal Tech Corp. Topic: N/AAN ADVANCED AIR COOLED, CYCLONE COAL COMBUSTOR WILL BE USED TO DEMONSTRATE ITS TECHNICAL AND ECONOMIC FEASIBILITY FOR EFFICIENT CONVERSION TO SLAG OF FLY ASH AND BOTTOM ASH FROM PULVERIZED COAL FIRED UTILITY BOILERS. A SERIES OF SHORT DURATION PARAMETRIC TESTS WILL BE PERFORMED IN WHICH FLY ASH WILL BE INJECTED INTO A COMMERCIAL SCALE COMBUSTOR INSTALLED ON A 17,500 LB/HR PACKAGE BOILER, LOCATED I ...
SBIR Phase II 1989 Department of Energy -
Harsh Fluorochemical Separations
SBC: COMPACT MEMBRANE SYSTEMS, INC. Topic: N/A60311 There are economic and environmental justifications for replacing conventional distillation processes with simpler membrane separations in certain applications. However, at present, there are no commercial membranes able to withstand the aggressive conditions associated with important industrial chemicals, including hydrogen fluoride, hydrogen chloride, and ozone. Prototype, chemic ...
SBIR Phase II 2001 Department of Energy -
Membranes for Reverse Organic-Air Separations
SBC: COMPACT MEMBRANE SYSTEMS, INC. Topic: N/A60395 Emissions of volatile organic compounds (VOC) from gasoline refueling facilities continue to be an energy, safety, and environmental issue. In such applications, it is desired to vent the air in the system and keep the VOC behind. This project will develop a reverse separation membrane (RSM) system that allows for rapid venting of air while retaining the gasoline in underground storag ...
SBIR Phase II 2001 Department of Energy -
Dewatering Membrane for Hazy Hydrodesulfurization Unit Effluents
SBC: COMPACT MEMBRANE SYSTEMS, INC. Topic: 09Many refinery product streams, particularly those from Ultra Low Hydrodesulfurisation units, are prone to haze due to water emulsions. Haze is also problematic for biodiesel production, as hazy fuel cannot be used until the haze settles or is removed, which creates costly scheduling and shipping delays. This project will develop a novel membrane process for the removal of dissolved and dispersed ...
SBIR Phase II 2008 Department of Energy -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation -
HydroMax- Overcoming the Challenges of Industrial Coal Gasification
SBC: Diversified Energy Corporation Topic: 18Volatile natural gas prices are negatively impacting the U.S. industrial sector, which consumes approximately 6.6 trillion cubic feet of natural gas annually. Over the last 24 months, natural gas prices have fluctuated between $5 and $12 per MMBtu, resulting in high and unpredictable fuel costs for the industrial sector. With abundant coal resources, an opportunity exists for the U.S. industrial ...
SBIR Phase II 2008 Department of Energy -
Nano-Scale High-Surface-Area Thermal and Conductive Ceramics as Effectice Support for Metal Oxide Catalysts in Alkane Selective Oxidation
SBC: Evernu Technology, Llc Topic: 07Compared with conventional processes used to produce many oxygenated chemicals, processes based on the selective catalytic oxidation of alkanes to produce oxygenates could yield enormous economic, energy, and environmental benefits. However, commercial development of such processes has been hindered, in part, because the excessive heat released by alkane oxidation causes over-oxidation (burning) ...
SBIR Phase II 2008 Department of Energy