You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Roadway Pavement Condition Sensor

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    This Phase II SBIUR (Small Business Innovative Research) proposal is based on work accomplished by Foster-Miller, Inc. and Battelle Memorial Institute during a prior Phase I SBIR program under contract DTRS57-99-C-00090. The purpose of the Phase I program was to develop an in-vehicle sensor to measure roadway surface conditions and, from these measurements, determine the coefficient of friction b ...

    SBIR Phase II 2001 Department of Transportation
  2. A Multi-Pedestrian Counting System Using Fusion of Stereo Camera and Laser Scanner

    SBC: Migma Systems Inc.            Topic: 091FH4

    In Phase I, we developed a new system for pedestrian detection, tracking and counting. In this system, both IR LED stereo camera and laser scanner were selected for use. We have demonstrated that our pedestrian counting system can count multiple pedestrians walking in a large group, maintain individual tracks even when some pedestrians walk in unpredictable patterns or leave the crosswalk prematur ...

    SBIR Phase II 2011 Department of Transportation
  3. Microscopic Traffic Flow Simulation Models- An Open Source Approach

    SBC: NEW GLOBAL SYSTEMS FOR INTELLIGENT TRANSPORTATION MANAGEMENT CORPORATION            Topic: 081FH5

    PHASE II TECHNICAL OBJECTIVE The major objective of this Phase II proposal is to establish open source traffic simulation model and software, and to develop application programming interfaces to accommodate future traffic research needs. Objectives will be accomplished by building and demonstrating FOMM, an open source traffic simulation model and software. Furthermore, to accommodate future resea ...

    SBIR Phase II 2011 Department of Transportation
  4. Wireless Brake Shoe Force Measurement System

    SBC: Mide Technology Corporation            Topic: 04FR1

    Railroad freight car safety and maintenance cost is directly related to knowledge of the actual braking force provided by a brake shoe. If the brake force is too low, safety is at risk. If the brake shoe is replaced before the end of it's lifetime to ensure safety, maintenance and thus operating costs are increased. Currently there is no system in place to monitor brake shoe force during train ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government