You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Production of Environmentally-Acceptable BioLubricants for Hydropower Applications

    SBC: RIKARBON INC            Topic: 15a

    Accidentally released lubricant into water bodies from hydropower production turbines and other marine (cruises, ships) applications challenges safe water recycling and management, and has invited a number of lawsuits.According to the Environmental Protection Agency, up to 16 million gallons of lubricants per year ? equating to 1.5 times the size of the Exxon Valdez spill ? are washed off into wat ...

    SBIR Phase II 2019 Department of Energy
  2. Radiation-Tolerant Thermal Interface Material with High Thermal Conductivity and Adhesion for HL-LHC Applications

    SBC: LIFE-E, LLC            Topic: 28d

    The Large Hadron Collider in Switzerland is the largest particle accelerator in the world.Upgrades bringing higher resolution (higher luminosity) is called HLLHC and will require improved lightweight materials.Thermal interface materials having higher thermal conductivity (> 4 W/mK) with low atomic mass and excellent radiation-resistance are required to achieve tight tolerances on detectors.The ob ...

    SBIR Phase II 2019 Department of Energy
  3. Atomically Smooth Surfaces as Substrates for Advanced Neutron Supermirrors

    SBC: AMERICAN PHYSICS AND TECHNOLOGY LLC            Topic: 12a

    Neutron scattering facilities are a key resource aiding the diverse and growing revolution in nano-science and technology. An ongoing challenge for these facilities is providing sufficient neutron flux for an acceptable signal-to-noise ratio for ever more precise experiments. Presently much of the neutron flux is lost because of inefficiencies in the hundreds of meters beam guides and other optics ...

    SBIR Phase II 2019 Department of Energy
  4. Novel Process for Biomass Conversion to 5 Carbon Alcohols

    SBC: Technology Holding, LLC            Topic: 18e

    Recent climate change conference of parties concluded the urgency of arresting the CO2 concentration in the atmosphere. It is imperative that everyday fuels and products be renewable to keep the temperature of the planet below 2 °C at the turn of the century. In addition, it is important to reduce US dependence on foreign petroleum imports and create rural jobs. Production of fuels and chemicals ...

    SBIR Phase II 2019 Department of Energy
  5. Improved Hydrogen Purification

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 10c

    Industrial hydrogen production relies primarily on natural gas and hydrocarbon feedstocks to drive the various reaction chemistries that lead to hydrogen generation. Carbon dioxide, the ultimate co-product when such feedstocks and processes are employed, necessarily becomes a major contaminant of the generated hydrogen. Thus, carbon dioxide isolation and removal is an important process step in th ...

    SBIR Phase II 2011 Department of Energy
  6. Novel Membranes for Olefin/Paraffin Separation

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 10d

    Ethylene and propylene are major chemical industry raw materials and consume a great deal of energy related to their production. It is estimated that 230 trillion BTU/yr are consumed in olefin/paraffin separations. Significant energy consumption is employed when cryogenically separating ethane from ethylene and propane from propylene. These cryogenic separations are difficult and are both capital ...

    SBIR Phase II 2011 Department of Energy
  7. A Technology to Mitigate Syngas Cooler Fouling

    SBC: REACTION ENGINEERING INTERNATIONAL            Topic: 25c

    Coal gasification plants have exhibited sub-par performance and plant economics due to poor reliability and availability. A major contributor to the poor performance has been fouling of the syngas cooler located downstream of the gasifier. The fouling is due to vaporized ash from the coal gasification process depositing on the fireside surface of the tubes in the fire tube heat exchanger used for ...

    SBIR Phase II 2011 Department of Energy
  8. Harsh Fluorochemical Separations

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: N/A

    60311 There are economic and environmental justifications for replacing conventional distillation processes with simpler membrane separations in certain applications. However, at present, there are no commercial membranes able to withstand the aggressive conditions associated with important industrial chemicals, including hydrogen fluoride, hydrogen chloride, and ozone. Prototype, chemic ...

    SBIR Phase II 2001 Department of Energy
  9. Membranes for Reverse Organic-Air Separations

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: N/A

    60395 Emissions of volatile organic compounds (VOC) from gasoline refueling facilities continue to be an energy, safety, and environmental issue. In such applications, it is desired to vent the air in the system and keep the VOC behind. This project will develop a reverse separation membrane (RSM) system that allows for rapid venting of air while retaining the gasoline in underground storag ...

    SBIR Phase II 2001 Department of Energy
  10. Dewatering Membrane for Hazy Hydrodesulfurization Unit Effluents

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 09

    Many refinery product streams, particularly those from Ultra Low Hydrodesulfurisation units, are prone to haze due to water emulsions. Haze is also problematic for biodiesel production, as hazy fuel cannot be used until the haze settles or is removed, which creates costly scheduling and shipping delays. This project will develop a novel membrane process for the removal of dissolved and dispersed ...

    SBIR Phase II 2008 Department of Energy
US Flag An Official Website of the United States Government