You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Software Package for Material Model Evaluation
SBC: APTEK, Inc. Topic: N/AThis Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...
SBIR Phase II 2004 Department of Transportation -
Portland Cement Concrete Pavement Recycling
SBC: Road Processing Resources Inc. Topic: N/ARPR's Phase I contract proved the feasibility of concrete recycling based o a shock-producing hammer/anvil concept for fracturing and sizing aggregate and separating reinforcing steel into marketable scrap. The Phase II project will develop a portable self-propelled prototype to remove and process a 12 foot wide roadway at a rate of about a mile a day. This is called "Fast Track" highway removal ...
SBIR Phase II 2004 Department of Transportation -
Climate Information Management Toolkit
SBC: Riverside Technologies Inc. Topic: 822The SBIR solicitation expressed the need for tools to process data from disparate sources in various formats and generate drought-relevant data products. NIDIS also recognizes a need to span organizational boundaries to provide access to integrated drought information for use in water management. The Phase I SBIR project resulted in prototype Climate Information Management Toolkit (CIMT) software ...
SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration -
Aerosol Particle Spectrometer with Depolarization and Fluorescence
SBC: Droplet Measurement Technologies, LLC Topic: 822An operational optical particle counter will be built, extensively characterized and evaluated that measures the size and shape of aerosol particles with optical diameter from 0.1 to 10 μm. This instrument will distinguish different species of dust and volcanic ash from other types of aerosol particles, and provide an estimate of the aerosol optical properties and produce compositional informati ...
SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration -
Cost Competitive Wave Energy Without Moving Parts
SBC: OSCILLA POWER INC Topic: 815Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...
SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration