You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Cost Competitive Wave Energy Without Moving Parts

    SBC: OSCILLA POWER INC            Topic: 815

    Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Real Time Signal State Transition Software for ATC- NTCIP Interface

    SBC: Advanced Technologies, Inc            Topic: 06FH1

    Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...

    SBIR Phase II 2012 Department of Transportation
  3. Signal State Transition Software Development

    SBC: Advanced Technologies, Inc            Topic: 06FH1

    ATI's Phase II effort will consist of developing an open source Signal Control Program Environment (SCOPE). This SCOPE will incorporate either an open source traffic signal control program or a more refined version of the signal control logic ATI developed in our Phase I effort. ATI will develop SCOPE so that the Cooperative Intersection Collision Avoidance System (CICAS) and Adaptive Control Sys ...

    SBIR Phase II 2011 Department of Transportation
US Flag An Official Website of the United States Government