You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
Signal State Transition Software Development
SBC: Advanced Technologies, Inc Topic: 06FH1ATI's Phase II effort will consist of developing an open source Signal Control Program Environment (SCOPE). This SCOPE will incorporate either an open source traffic signal control program or a more refined version of the signal control logic ATI developed in our Phase I effort. ATI will develop SCOPE so that the Cooperative Intersection Collision Avoidance System (CICAS) and Adaptive Control Sys ...
SBIR Phase II 2011 Department of Transportation -
Solar Roadways
SBC: SOLAR ROADWAYS INCORPORATED Topic: 091FH5As stated in the solicitation, the pavement infrastructure in the US covers a large surface area and requires intensive energy and natural resources. In addition, the surface of the pavement is typically impermeable, causing negative consequences. Vehicles that travel over these pavements are also resource intensive. Solar Roadways Incorporated envisions replacing current asphalt surfaces with m ...
SBIR Phase II 2011 Department of Transportation -
Cost Competitive Wave Energy Without Moving Parts
SBC: Oscilla Power, Inc. Topic: 815Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...
SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration