You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Ominidirectional Wheelchair to Greatly Increase Mobility in Vocational Rehabilitation and Independent Living Daily Activities
SBC: Lincoln Laboratories Topic: N/AN/A
SBIR Phase II 2001 Department of Education -
Solar Roadways
SBC: SOLAR ROADWAYS INCORPORATED Topic: 091FH5As stated in the solicitation, the pavement infrastructure in the US covers a large surface area and requires intensive energy and natural resources. In addition, the surface of the pavement is typically impermeable, causing negative consequences. Vehicles that travel over these pavements are also resource intensive. Solar Roadways Incorporated envisions replacing current asphalt surfaces with m ...
SBIR Phase II 2011 Department of Transportation -
Belt Shift Interlock Delay/Deaccelerator with Learning Curve Software to Increase Seatbelt Usage on Commercial Vehicles
SBC: The Tenik Group Inc. Topic: 07FM1Various methods for increasing seat belt usage have been investigated over the last several years including visual and audible warnings currently installed in today’s vehicles. In spite of these attempts, FMCSA research has shown that drivers of about 59% of commercial motor vehicles (those weighing 10,000 pounds or more that operate in interstate commerce) buckle their safety belts as compared ...
SBIR Phase II 2011 Department of Transportation -
Cost Competitive Wave Energy Without Moving Parts
SBC: OSCILLA POWER INC Topic: 815Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...
SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration -
Virtual Environment for Social Information Processing (VESIP) Phase II
SBC: SOAR TECHNOLOGY INC Topic: 84133S2This project builds upon on previous work on a theory-based tool that assesses and trains children with autism spectrum disorders social information processing (SIP) skills. This system, the virtual environment for social information processing (VESIP), is a significant improvement over existing measures of social skill in several ways: (1) its standardized, computer-delivered form reduces trainin ...
SBIR Phase II 2011 Department of Education