You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
  2. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  3. ADVANCED MATERIAL CONCEPTS FOR GUARDRAIL END TREATMENTS

    SBC: United Dynamics, Inc.            Topic: N/A

    GUARDRAIL TERMINALS ARE SOME OF THE MORE TROUBLESOME AND POTENTIALLY HAZARDOUS ROADSIDE APPURTENANCES. RECENTLY DEVELOPED TERMINAL CONCEPTS WHICH HAVE PASSED CURRENT CRASH TEST CRITERIA TEND TO BE EXPENSIVE AND MAY REQUIRE EXCESSIVE LENGTH OF NEED, FLARE-OUT SPACE AND ADDITIONAL FILL AND GRADING. THIS PHASE I SBIR PROPOSAL ADDRESSES THE DEVELOPMENT OF A MORE EFFICIENT ENERGY ABSORBING TERMINAL CON ...

    SBIR Phase II 1994 Department of Transportation
  4. Solar Roadways

    SBC: SOLAR ROADWAYS INCORPORATED            Topic: 091FH5

    As stated in the solicitation, the pavement infrastructure in the US covers a large surface area and requires intensive energy and natural resources. In addition, the surface of the pavement is typically impermeable, causing negative consequences. Vehicles that travel over these pavements are also resource intensive. Solar Roadways Incorporated envisions replacing current asphalt surfaces with m ...

    SBIR Phase II 2011 Department of Transportation
  5. Cost Competitive Wave Energy Without Moving Parts

    SBC: OSCILLA POWER INC            Topic: 815

    Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  6. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government