You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Roadway Pavement Condition Sensor

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    This Phase II SBIUR (Small Business Innovative Research) proposal is based on work accomplished by Foster-Miller, Inc. and Battelle Memorial Institute during a prior Phase I SBIR program under contract DTRS57-99-C-00090. The purpose of the Phase I program was to develop an in-vehicle sensor to measure roadway surface conditions and, from these measurements, determine the coefficient of friction b ...

    SBIR Phase II 2001 Department of Transportation
  2. WASH DOTS Invasive Plant Protection Wash Units

    SBC: Kennedy, Sheilah A            Topic: 081FH3

    Design and field test system, at interested DOT sites, research commercialization market, seek pre-orders from State, Federal, Tribal and local Government entities for full production phase.

    SBIR Phase II 2011 Department of Transportation
  3. A Multi-Pedestrian Counting System Using Fusion of Stereo Camera and Laser Scanner

    SBC: Migma Systems Inc.            Topic: 091FH4

    In Phase I, we developed a new system for pedestrian detection, tracking and counting. In this system, both IR LED stereo camera and laser scanner were selected for use. We have demonstrated that our pedestrian counting system can count multiple pedestrians walking in a large group, maintain individual tracks even when some pedestrians walk in unpredictable patterns or leave the crosswalk prematur ...

    SBIR Phase II 2011 Department of Transportation
  4. Natural Adjuvants to Enhance Efficacy of Viral Vaccines for Mariculture

    SBC: ProFishent Inc            Topic: 812

    Marine aquaculture production now exceeds 20 million metric tons annually (FAO 2010) but viral diseases are still a major threat to the expansion of sustainable mariculture systems (National Marine Fisheries Service 2007). Pathogenic viruses continue to devastate many fish and shellfish operations every year (ICES Mariculture Committee 2004, Lightner 2011). To date, vaccines against aquatic anim ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Cost Competitive Wave Energy Without Moving Parts

    SBC: OSCILLA POWER INC            Topic: 815

    Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  6. Wireless Brake Shoe Force Measurement System

    SBC: Mide Technology Corporation            Topic: 04FR1

    Railroad freight car safety and maintenance cost is directly related to knowledge of the actual braking force provided by a brake shoe. If the brake force is too low, safety is at risk. If the brake shoe is replaced before the end of it's lifetime to ensure safety, maintenance and thus operating costs are increased. Currently there is no system in place to monitor brake shoe force during train ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government