You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations. This project will deliver an individualized Fatigue Management Program (FMP) technology for trucking operations that in ...

    SBIR Phase I 2009 Department of Transportation
  2. Low-Cost, Full-Field, Surface Profiling Tool for Mechanical Damage Evaluation

    SBC: INTELLIGENT OPTICAL SYSTEMS, INC.            Topic: 091PH1

    Mechanical damage (typically from third party excavations) is the most frequent source of leaks and ruptures in pipelines. The most common type of mechanical damage is dents, sometimes associated with secondary features such as gouges, external corrosion, or cracks. Currently used techniques for assessing dents are not accurate enough for reliable determination of fitness for service. In this p ...

    SBIR Phase I 2009 Department of Transportation
US Flag An Official Website of the United States Government