You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MISSE Testing of Impact-Resistant, Damage-Tolerant Composites with STF Energy Absorbing Layers

    SBC: STF TECHNOLOGIES LLC            Topic: Z4

    The proposed project utilizes the unique capabilities of the Materials International Space Station Experiment-Flight Facility (MISSE-FF) platform to perform low-Earth orbit (LEO) materials validation testing to advance the Technology Readiness Level (TRL) of advanced spacesuit hard upper torso (HUT) composite materials developed under a prior NASA SBIR Phase I/current Phase II contract.nbsp; The d ...

    SBIR Phase I 2019 National Aeronautics and Space Administration
  2. A High Reliability Frequency Stabilized Semiconductor Laser Source

    SBC: Princeton Optronics            Topic: S101

    NASA needs high stability laser source of 1W output power for Lidar applications. Princeton Optronics has developed ultra-stable, narrow linewidth diode pumped solid state lasers using stable packaging and high performance locker. We have also developed high power Vertical Cavity Surface Emitting Laser (VCSEL) semiconductor laser sources. We propose to develop a high reliability master oscillator ...

    SBIR Phase I 2009 National Aeronautics and Space Administration
  3. Miniature, Rugged, Pulsed Laser Source for LIDAR Application

    SBC: Princeton Optronics            Topic: S101

    Princeton Optronics proposes to develop a high energy pulsed laser source based on a novel approach. The approach consists of a technique to combine a large number of diode pumped solid state lasers. The resulting laser can be packaged in a very small package. We will develop the laser and package it into a laser welded package which can be space qualified. We can achieve 50mJ or higher level of e ...

    SBIR Phase I 2009 National Aeronautics and Space Administration
  4. Novel Photonic RF Spectrometer

    SBC: SPECTRUM MAGNETICS LLC            Topic: S104

    Leveraging on recent breakthroughs in broadband photonic devices and components for RF and microwave applications, SML proposes a new type of broadband microwave spectrometer with performance and affordability that were not attainable before. The photonic microwave spectrometer overcomes the constrains associated with microwave electronics, linearly and simultaneously offering 6-18 GHz (potential ...

    SBIR Phase I 2009 National Aeronautics and Space Administration
  5. TECHNOLOGY FOR PRESSURE-INSTRUMENTED THIN AIRFOIL MODELS

    SBC: Applied Cryogenics & Materials            Topic: N/A

    PRESSURE INSTRUMENTED AIRFOIL MODELS FOR TESTING IN CRYOGENIC WIND TUNNELS DEMAND THE SIMULTANEOUS ACHIEVEMENT OF MANY FACTORS INCLUDING STRENGTH, TOUGHNESS, DIMENSIONAL STABILITY, MACHINABILITY, BONDABILITY, ACCURACY OF PROFILE AND SURFACE FINISH. MANY PREVIOUS MODELS HAVE FAILED TO REACH COMPLETION OR HAVE PERFORMED INADEQUATELY BECAUSE ACHIEVEMENT OF SOME FACTORS HAS CRITICALLY COMPROMISED OTHE ...

    SBIR Phase II 1984 National Aeronautics and Space Administration
  6. THE PRIMARY PURPOSE OF THIS PROJECT IS TO REDUCE THE REQUIREMENTS FOR INITIAL ALIGNMENT ACCURACY WHEN BRINGING A PAIR OF CONNECTORS TOGETHER PRIOR TO MATING THEM.

    SBC: Arbus, Inc.            Topic: N/A

    THE PRIMARY PURPOSE OF THIS PROJECT IS TO REDUCE THE REQUIREMENTS FOR INITIAL ALIGNMENT ACCURACY WHEN BRINGING A PAIR OF CONNECTORS TOGETHER PRIOR TO MATING THEM. THIS WILL BE ACCOMPLISHED BY INVESTIGATING THE USE OF A TAPERED OR CONICAL DESIGN TO INCLUDE A PRELIMINARY LATCHING FEATURE TO CAPTURE AND TO CAUSE ALIGNMENT OF A PAIR OF COMPLEMENTARY CONNECTORS. THE INVESTIGATION WILL TAKE INTO CONSIDE ...

    SBIR Phase I 1984 National Aeronautics and Space Administration
  7. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
US Flag An Official Website of the United States Government