You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Transition Metal Oxide Optical Switch

    SBC: 4WAVE, INC.            Topic: A09079

    We propose to test a new sputtering method, Biased Target Deposition (BTD), for growth of polycrystalline VO2 thin films. The BTD method has been shown to be more stable and flexible for reactive deposition than previously used techniques, and we test whether VO2 can be driven into different microstructures, hence properties, by varying growth conditions. We focus on the optically-driven insulator ...

    SBIR Phase I 2009 Department of DefenseArmy
  2. Tunnel Detection using MASINT Techniques

    SBC: McQ Inc.            Topic: A09148

    McQ will build upon its extensive experience with MASINT unattended ground sensors and electronics systems to develop a portable sensor system that will detect, classify and provide location information for buried tunnels. We will first demonstrate the technical feasibility of using MASINT techniques to exploit both the signals associated with tunnel detection and the physics of propagation to det ...

    SBIR Phase I 2009 Department of DefenseArmy
  3. DESIGN AND DEVELOPMENT OF ADHESIVELY BONDED JOINTS

    SBC: Abaris            Topic: N/A

    THE U.S. ARMY HAS A NEED FOR A LIGHTWEIGHT, STRONG, MOBILE BRIDGE. ONE PROBLEM THAT LIMITS THE PERFORMANCE IS THE DESIGN OF ADHESIVE JOINTS. THIS PROJECT IS TO DEVELOP SEVERAL OPTIMUM JOINT DESIGNS SO THAT THE LOADS ON JOINTS OF EITHER TUBULAR AND FLAT COMPONENTS ARE IN SHEAR, AND THE STRESS CONCENTRATIONS ARE REDUCED. THE PROPOSED PROGRAM IS TO USE THE RESEARCH WE HAVE ACCOMPLISHED IN EXPERT SYST ...

    SBIR Phase I 1991 Department of DefenseArmy
  4. LOW ELEVATION SENSITIVE GPS ANTENNA WITH MULTIPATH SUPPRESSION

    SBC: Adroit Systems, Inc.            Topic: N/A

    ADROIT SYSTEMS, INC. PROPOSES TO DESIGN A NEW ANTENNA FOR A DIFFERENTIAL GPS (DGPS) BASE RECEIVER IN PHASE I, AND TO PROTOTYPE AND TEST THIS ANTENNA IN PHASE II. THIS NEW ANTENNA WILL INCORPORATE OPTIMUM LOW ELEVATION GAIN AND MULTIPATH SUPPRESSION TO ALLOW THE TRACKING OF SATELLITES AT ELEVATIONS FROM THE HORIZON TO FIVE DEGREES. AT ALL ELEVATIONS, THE ANTENNA WILL MINIMIZE ERRORS DUE TO MULTIPAT ...

    SBIR Phase I 1991 Department of Transportation
  5. DYNAMIC GPS ATTITUDE DETERMINING SYSTEM FOR MARINE APPLICATIONS

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  6. INTEGRATED FIRE AND FLIGHT CONTROL TECHNOLOGY

    SBC: Aerospace Technology Co            Topic: N/A

    THE INTEGRATED FIRE AND FLIGHT CONTROL (IFFC) SYSTEM CONCEPT EMBODIES THE TOTAL AIRFRAME-DIRECTOR-WEAPON OPERATIONAL EFFECTIVENESS. BY THIS IS MEANT THAT THE DECENTRALIZED AND SOMEWHAT AUTONOMOUS CONTROL OF THE ROTORCRAFT COMBAT SYSTEMS ARE COORDINATED BY A CENTRAL AUTOMATIC CONTROL ELEMENT WHICH, GIVEN SUITABLE OPTIMAL CRITERIA, HAS THE POTENTIAL OF ENHANCING WEAPON DELIVERY ACCURACY WHILE AT THE ...

    SBIR Phase I 1991 Department of DefenseArmy
  7. Innovative Real Time Probes for Plastic Bonded Exp

    SBC: ALPHASENSE, INC.            Topic: A09026

    In this proposal, AlphaSense, Inc. proposes to develop an innovative real time probe for online monitoring of plastic bonded explosive manufacturing process. Key innovations of the proposed sensor probe include: a) the use of a white light interferometer (WLI) to form real time images of the particles for accurate particle size measurements, and b) the use of quartz crystal microbalance (QCM) base ...

    SBIR Phase I 2009 Department of DefenseArmy
  8. BATTLEFIELD ASSESSMENT AND DECISION ASSISTANCE SYSTEM USING NEURAL NETWORKS AND AN EXPERT SYSTEM DIRECTOR

    SBC: American Research Corporation of Virginia            Topic: N/A

    THE U.S. ARMY HAS IDENTIFIED A NEED FOR COMPUTER-BASED DECISION AIDS FOR BATTLEFIELD PARAMETER ANALYSIS, LOGISTICS ASSESSMENT AND COMMAND DECISION RECOMMENDATION. TO ADDRESS THIS NEED, AMERICAN RESEARCH CORPORATION OF VIRGINIA (ARCOVA) PROPOSES AN ARTIFICIALLY INTELLIGENT ASSESSMENT AND DECISION RECOMMENDATION ASSISTANT CAPABLE OF ANALYZING ENVIRONMENTAL AND TOPOGRAPHICAL PARAMETERS AND PROVIDING ...

    SBIR Phase I 1991 Department of DefenseArmy
  9. LASER GENERATED SURFACE ACOUSTIC WAVES FOR FLAW DETECTION IN TRANSPORTATION SYSTEMS.

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  10. THIN FILM SENSORS TO EVALUATE CHEMICAL AND BIOLOGICAL THREATS TO ARMY STRUCTURES

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government