ADVANCING BATHYMETRY AND STREAMFLOW SURVEY TO REAL-TIME SCOUR PREDICTION: AN AUTOMATED ALGORITHM
SBC: Genex Systems LLC Topic: 20FH3Most research on scour assessment has traditionally focused on developing best-fit or envelope equations to estimate the maximum scour depths from physical experiments in a laboratory environment. However, obtaining an accurate estimate is always a challenge due to numerous uncertainties in the actual riverine or coastal environment. With advances in new surveying technologies and growing computat ...
SBIR Phase I 2020 Department of Transportation -
Developing Regional GIC Hazard Tools for Power Utility Planning and Operations
SBC: COMPUTATIONAL PHYSICS, INC. Topic: 9302Geomagnetically induced current (GIC) hazard is a recognized threat to the United States power system. Federal models to support hazard specification and prediction for critical infrastructure are at an advanced state, including models of space weather, the Earth’s conductive structure, and regional geoelectric field. We propose to use existing NOAA Space Weather Prediction Center (NOAA-SWPC) mo ...
SBIR Phase I 2020 Department of CommerceNational Oceanic and Atmospheric Administration -
Highway Induction Paint to Enable Safety Messaging
SBC: NANOSONIC INC. Topic: 190FH1The objective of the proposed Phase I Department of Transportation/Federal Highway Administration SBIR program is to develop a sprayable highway paint to communicate vehicle-to-everything (V2X) safety messages between infrastructure, vehicles and pedestrians. During Phase I, NanoSonic will work with Virginia Tech antenna designers and the Virginia Tech Transportation Institute (VTTI) to design and ...
SBIR Phase I 2020 Department of Transportation -
ICING MONITORING EQUIPMENT
SBC: JONAS, INC. Topic: N/AN/A
SBIR Phase I 1984 Department of Transportation -
LASER GENERATED SURFACE ACOUSTIC WAVES FOR FLAW DETECTION IN TRANSPORTATION SYSTEMS.
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1984 Department of Transportation -
Managing Geohazards- Quantitative Risk Assessment for Pipelines
SBC: APPLIED ENGINEERING MANAGEMENT CORPORATION Topic: 20PH3This Small Business Innovation Research (SBIR) Phase I project will investigate the value of a quantitative risk assessment tool for management of geohazard threats to pipelines.Phase I will determine data sources for quantitative risk assessment to support management and decision-making needs of pipeline industry stakeholders; identify the potential market for such a tool; identify a study locati ...
SBIR Phase I 2020 Department of Transportation -
Modular Lightweight Composite Deck
SBC: PRECAST SYSTEMS ENGINEERING, LLC Topic: 20FH2A newly proposed combination of high-strength weathering steel sheet with Ultra-High Performance Concrete (UHPC) to leverage the benefits of both emerging technologies. The combined system offers benefits over traditional orthotropic steel decks and existing concrete or UHPC deck solutions, both of which offer high up-front costs in fabrication or forming. The resulting composite structure provide ...
SBIR Phase I 2020 Department of Transportation -
Non-contact Track Gage Measurement System (NC-TGMS)
SBC: DFUZION, INC. Topic: 081FR4One of the causes of derailments occurs when the track gage is no longer compliant with the FRA track safety standards for gage measurments. Ensuring track gage is in compliance with the FRA track safety standards is therefore of paramount importance to the FRA. Currently, the FRA wishes to develop a non-contact track gage measurement system that overcomes the limitations of current systems (unr ...
SBIR Phase I 2009 Department of Transportation -
Portable Active Thermographic Coating Inspection System
SBC: Fuchs Consulting Inc Topic: 091FH2This proposal seeks to produce a unique thermographic coating inspection system that is customized for the inspection of bridge coatings. This system uses active thermography where IR sources are used to provide controlled heating to a coating system. The presence of a defect in a coating system will result in differences in heat flow, which can be imaged with an infrared camera. An off-the-she ...
SBIR Phase I 2009 Department of Transportation -
Roadway Waste Heat Electricity Production Using Impoved Roadway Paving Technologies
SBC: Planphoria LLC Topic: 091FH5Planphoria will research, define and develp methods to turn our nation's roadways into a giant energy collection and transference system that produces low cost electrical energy close to point of use. Though roadway environmental conditions change, and different roadway requirements vastly differ from the requirements of other roadways, we will determine the feasibility of this concept by leading ...
SBIR Phase I 2009 Department of Transportation