You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. THIS PROJECT AIMS AT DEVELOPING A HIGHLY ACCURATE AND ECONOMICAL AIRCRAFT ALTIMETER.

    SBC: Gulf Applied Research Inc.            Topic: N/A

    THIS PROJECT AIMS AT DEVELOPING A HIGHLY ACCURATE AND ECONOMICAL AIRCRAFT ALTIMETER. THE MOTION OF AN EVACUATED BELLOWS WILL BE MONITORED BY AN OPTICAL POSITION SENSOR WHICH WILL GIVE AN ELECTRICAL ANALOG SIGNAL LINEARLY RELATED TO THE ATMOSPHERIC PRESSURE. WHILE THE SENSOR IS VERY SMALL, RUGGED AND INEXPENSIVE, IT HAS A LARGE DYNAMIC RANGE (100,000), HIGH LINEARITY (0.01%) AND HIGH SENSITIVITY (M ...

    SBIR Phase I 1984 Department of Transportation
  2. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  3. Microwave measurement of rail distance traveled

    SBC: Systems & Materials Research Corporation            Topic: 081FR3

    Rail vehicle distance traveled measurements don't currently meet the precision requirement of 5ft./mile. An innovative microwave technique is proposed using two X band transceiver assemblies separated by a known distance. Reflected energy from metal objects such as tie-plates or dielectric contrast between ties and rail bed are used as replicate pairs to measure the time passage between transcei ...

    SBIR Phase I 2009 Department of Transportation
US Flag An Official Website of the United States Government