You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Electric Pyrogens and Systems for Safer In-line Inititation of Rocket Motors

    SBC: Digital Solid State Propulsion, Inc            Topic: MDA08045

    We will use our newly developed smart energetic materials to eliminate flame sensitive pyrogens and the bridge-wire connections for thermal ignition within initiators/squibs which will improve safety for Mil. Std. 1901A compliance. Unlike conventional materials, new pyrogen materials are insensitive to ignition by flame and so can not flame spread by impingement. However, new faster burning formu ...

    SBIR Phase II 2010 Department of DefenseMissile Defense Agency
  2. Low Cost Fuel Grade Ethanol

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 88

    The membrane drying process for ethanol plants should be of great value in increasing capacity and/or reducing energy consumption for existing ethanol plants. We will manufacture modules of the novel membrane with a commercial partner. A pilot demonstration unit will be constructed and deployed at an actual ethanol plant for demonstrating the membrane process capabilities and advantages.

    SBIR Phase II 2010 Department of Agriculture
  3. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
US Flag An Official Website of the United States Government