You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
  2. Low Cost Fuel Grade Ethanol

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 88

    The membrane drying process for ethanol plants should be of great value in increasing capacity and/or reducing energy consumption for existing ethanol plants. We will manufacture modules of the novel membrane with a commercial partner. A pilot demonstration unit will be constructed and deployed at an actual ethanol plant for demonstrating the membrane process capabilities and advantages.

    SBIR Phase II 2010 Department of Agriculture
  3. Children`s Nutrition and Exercise, Healthy Lifestyles Video Game

    SBC: COMMGRAPHICS INTERACTIVE, INC            Topic: N/A

    Childhood obesity and overweight continue to be one of the greatest public health threats in the United States (DHHS, 2001; Visscher & Seidel, 2001; Rugg, 2004). Childhood weight and behavior are significant predictors of adult overweight and obesity (Whitaker, 1997; Dietz & Gortmaker, 2001; ACS, 2004). While programs that attempt to address weight issues continue to be developed, the problem cont ...

    SBIR Phase II 2009 Department of Agriculture
US Flag An Official Website of the United States Government