You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
  2. Low Cost Fuel Grade Ethanol

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 88

    The membrane drying process for ethanol plants should be of great value in increasing capacity and/or reducing energy consumption for existing ethanol plants. We will manufacture modules of the novel membrane with a commercial partner. A pilot demonstration unit will be constructed and deployed at an actual ethanol plant for demonstrating the membrane process capabilities and advantages.

    SBIR Phase II 2010 Department of Agriculture
  3. Improving the efficiency of feed use in the cattle industry

    SBC: 3 C CATTLE FEEDERS, INC.            Topic: N/A

    3-C Cattle Feeder, in collaboration with the New Product Development Center [NPDC] at OSU will develop enhanced prototypes to be tested in the field. The doors to the feeder will be controlled by an RFID reader which actuates a motor allowing the feeder doors to open. For safety, the doors are fail-safed using an infrared safety switch to prevent the doors from closing on a cow or calf, while thei ...

    SBIR Phase II 2009 Department of Agriculture
US Flag An Official Website of the United States Government