You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Developing a Molecular-Assisted Hybridization Strategy for the Improvement of the Quality of Poplar Biomass for The United States` Bio-Fuels
SBC: GREENWOOD RESOURCES, INC. Topic: N/AHighly productive, third-rotation commercial plantations have been successfully managed in the United States by the pulp and paper, timber, and the environmental-remediation industries for more than 40 years with great success in terms of wood yields and job creation. The success of the poplar plantation industry has consistently been shown to be dependent the propagation of elite varieties that h ...
SBIR Phase II 2009 Department of Agriculture -
Low Cost Fuel Grade Ethanol
SBC: COMPACT MEMBRANE SYSTEMS, INC. Topic: 88The membrane drying process for ethanol plants should be of great value in increasing capacity and/or reducing energy consumption for existing ethanol plants. We will manufacture modules of the novel membrane with a commercial partner. A pilot demonstration unit will be constructed and deployed at an actual ethanol plant for demonstrating the membrane process capabilities and advantages.
SBIR Phase II 2010 Department of Agriculture -
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: 081FH2City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...
SBIR Phase II 2010 Department of Transportation