You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
  2. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  3. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  4. Low Cost Fuel Grade Ethanol

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 88

    The membrane drying process for ethanol plants should be of great value in increasing capacity and/or reducing energy consumption for existing ethanol plants. We will manufacture modules of the novel membrane with a commercial partner. A pilot demonstration unit will be constructed and deployed at an actual ethanol plant for demonstrating the membrane process capabilities and advantages.

    SBIR Phase II 2010 Department of Agriculture
  5. Research and Development of Alternatives to the Walk-behind Rotary Tiller Suitable for Women Farmers

    SBC: GREEN HERON TOOLS, LLC            Topic: 812

    The number of women farmers in the U.S. has been rising over the past several decades, with the rate of growth accelerating between the 2002 and 2007 Censuses of Agriculture, to nearly 1 million female farm operators in 2007. Between 1980 and 2002, the number of women-operated farms had increased by 86%, a rate far surpassing growth in U.S. farms overall. These data underscore the need for agricul ...

    SBIR Phase II 2010 Department of Agriculture
  6. An Advanced Information System for Timely Assessments of International Crop Market Opportunities

    SBC: GDA CORP            Topic: N/A

    Situation or Problem In order to provide timely and reliable assessments of the global crop market, it is necessary to move from limited, in situ crop assessments to operational crop monitoring on regional and global scales with multi-temporal remotely sensed (RS) data. Due to timeliness requirements and large volumes of imagery needed for operational agricultural monitoring, it is important that ...

    SBIR Phase II 2008 Department of Agriculture
  7. NanoBiocides for Wood-Based Construction Materials

    SBC: LIG SCIENCES , INC            Topic: N/A

    The U.S. forest products industry had sales of $262B in 1997, of which two thirds was used for building construction. The use of wood for home construction is an effective, efficient, environmentally friendly, renewable construction material. A key issue in using wood materials in construction is their susceptibility to mold, fungi, and termite infestation resulting in over $10B combined damage pe ...

    SBIR Phase II 2008 Department of Agriculture
US Flag An Official Website of the United States Government