You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: 081FH2City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...
SBIR Phase II 2010 Department of Transportation -
Low Cost Fuel Grade Ethanol
SBC: COMPACT MEMBRANE SYSTEMS, INC. Topic: 88The membrane drying process for ethanol plants should be of great value in increasing capacity and/or reducing energy consumption for existing ethanol plants. We will manufacture modules of the novel membrane with a commercial partner. A pilot demonstration unit will be constructed and deployed at an actual ethanol plant for demonstrating the membrane process capabilities and advantages.
SBIR Phase II 2010 Department of Agriculture -
Rapid enzyme based detection of toxins in food.
SBC: BIOO SCIENTIFIC CORPORATION Topic: N/AThe safety of the public food supply is an emerging and important public health issue in the United States. Recent, widely-reported food and feed contaminations by pathogens and banned substances such as melamine have fueled an increased demand for improved assays to screen and protect the food supply. The antibody-based ELISA assay is a powerful, cost-effective method to detect trace analytes, su ...
SBIR Phase II 2009 Department of Agriculture