You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: 081FH2City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...
SBIR Phase II 2010 Department of Transportation -
Low Cost Fuel Grade Ethanol
SBC: COMPACT MEMBRANE SYSTEMS, INC. Topic: 88The membrane drying process for ethanol plants should be of great value in increasing capacity and/or reducing energy consumption for existing ethanol plants. We will manufacture modules of the novel membrane with a commercial partner. A pilot demonstration unit will be constructed and deployed at an actual ethanol plant for demonstrating the membrane process capabilities and advantages.
SBIR Phase II 2010 Department of Agriculture -
ICING MONITORING EQUIPMENT
SBC: JONAS, INC. Topic: N/AA SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...
SBIR Phase II 1985 Department of Transportation