The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
  2. Low Cost Fuel Grade Ethanol

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 88

    The membrane drying process for ethanol plants should be of great value in increasing capacity and/or reducing energy consumption for existing ethanol plants. We will manufacture modules of the novel membrane with a commercial partner. A pilot demonstration unit will be constructed and deployed at an actual ethanol plant for demonstrating the membrane process capabilities and advantages.

    SBIR Phase II 2010 Department of Agriculture
  3. Delivering the Health, Environmental and Economic Benefits of Trails to Rural Americans through a High Efficiency Trail Assessment Process

    SBC: BENEFICIAL DESIGNS INC            Topic: N/A

    The Universal Trail Assessment Process (UTAP) and TrailWare, software for UTAP data, were developed to obtain objective trail information. Over 700 people within Federal, State, local and non-profit agencies have been UTAP trained throughout the US. Requiring 9 to 15 person hours per mile of trail is the primary factor that limits the use of UTAP. Over 85% of rural land managers consider objective ...

    SBIR Phase II 2005 Department of Agriculture
  4. Enhancing Biosynthesis of Biofuels from Cellulosic Biomass

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 88

    There continues to be a need for production of biofuels from agricultural sources. Butanol is a more attractive fuel than ethanol because it leads to better gas mileage, it achieves higher blends with gasoline than bioethanol, it has greater compatibility with existing fuel infrastructure, it is less volatile, it is more amenable to transport via pipeline due to low water absorption, there is no n ...

    SBIR Phase II 2012 Department of Agriculture