You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Treatment of Canine Diabetic Cataracts

    SBC: Therapeutic Vision, Inc.            Topic: NEI

    DESCRIPTION (provided by applicant): Diabetes mellitus (DM) in dogs is characterized by a rapid onset of bilateral cataracts that result in vision loss. Over 400,000 dogs annually develop cataracts that results in vision loss and currently the only medical treatment for these dogs is cataract surgery between 3,500-6,000. We have developed an alternative, nonsurgical medical treatment that is comp ...

    SBIR Phase II 2010 Department of Health and Human ServicesNational Institutes of Health
  2. PHASE II TOPIC 233: AUTOMATED PROCESSING OF CANCER-RELATED DATA

    SBC: QUANTUMMARK LLC            Topic: N/A

    Location 1860 WENDY WAY RENO, NV 89509 United States N44CO200900040 $749 996.00 2 009 PHASE II TOPIC 233: AUTOMATED PROCESSING OF CANCER-RELATED DATA Department of Health and Human Services National Institutes of Health SBIR PHS2009-1 QUANTUMMARK LLC Phas ...

    SBIR Phase II 2009 Department of Health and Human ServicesNational Institutes of Health
  3. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
US Flag An Official Website of the United States Government