You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Detection, Control and Warning System (DCWS) to mitigate Dilemma Zone (DZ)

    SBC: INTELLIGENT AUTOMATION, INC.            Topic: 082FH1

    To mitigate the Dilemma Zone (DZ) problem, Intelligent Automation, Inc. (IAI) team proposes an innovative vehicle specific Detection, Control and Warning System (DCWS). DCWS provides vehicle-specific dilemma zone protection based on travel time to the intersection as opposed to more conventional systems which protect a fixed area on the pavement. Apart from incorporating advanced signal control ...

    SBIR Phase II 2010 Department of Transportation
  2. Balancing Safety and Capacity in an Adaptive Traffic Signal Control System

    SBC: Sabra & Associates, Inc.            Topic: 081FH1

    This research focuses on the development of a real-time signal timing methodology and algorithms that balance safety and efficiency. This research consists of two phases: Phase I was completed in December 2009; it examined the relationships between signal timing and surrogate measures of safety, namely the frequency of rear-end, angle and lane-change conflicts. The FHWA Surrogate Safety Assessm ...

    SBIR Phase II 2010 Department of Transportation
  3. A Novel Multi-Sensor Wireless Network for Bridge Structural Health Monitoring

    SBC: INTELLIGENT AUTOMATION, INC.            Topic: 081FH6

    The ability to monitor the integrity of a bridge structure and detect damage or condition changes at early stages is of significant importance for bridge operation safety. Currently, the most widely used damage detection methods rely on subjective, incremental visual assessments or localized testing techniques. In this proposal, we propose to develop and test a low cost and efficient bridge stru ...

    SBIR Phase II 2010 Department of Transportation
  4. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
  5. Automated High Speed, Low Water Consumption Insulator Cleaner

    SBC: MINI, LLC            Topic: 07FT4

    This Phase II proposal develops a novel third rail insulator cleaner called the Vohrtex based.on the successfully completed Phase I project that developed the low water consumption, quick cleaning tool, the “Spin Wedge.” The Vohrtex slides on the third rail and is attached to a service vehicle that rides on the track. The Vohrtex has a pair of arms, which hang down on opposite sides of the t ...

    SBIR Phase II 2010 Department of Transportation
US Flag An Official Website of the United States Government