You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: 081FH2City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...
SBIR Phase II 2010 Department of Transportation -
Design, Development and Testing of Optimized "Soft Crack Arrestors"
SBC: ENGINEERING MECHANICS CORPORATION OF COLUMBUS Topic: 07PH1EMC2''s Phase II proposal focuses on continuing development of "Soft Crack Arrestors" through additional key material property, detailed analytical refinement of the design, and full-scale pipe validation testing. This material testing will be done over a range of temperatures to cover extreme conditions for future pipeline designs, with special attention to arctic applications. It is also essen ...
SBIR Phase II 2009 Department of Transportation