You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
  2. Field Rail Welding with the Electroslag Welding Process

    SBC: EST&D LLC            Topic: 101FR5

    The two most frequently used field rail welding processes, thermite and flash-butt, have limitations. The thermite process, though less expensive and more portable, sometimes produces welds with inclusions which can limit short term quality and long term fatigue life. Flash-butt, which produces a very high quality weld, is not as portable as thermite. SBIR solicitation 10.1 FR5 requires a new w ...

    SBIR Phase I 2010 Department of Transportation
US Flag An Official Website of the United States Government