You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Driver Fatigue, Distraction, and Alerting Technology

    SBC: Transecurity LLC            Topic: 06FM1

      Transecurity successfully developed a multi-variable drowsy driver mitigation system (DDMS) concept in their SBIR Phase I project.  This system combines together many indicators of drowsiness and alertness into a composite drowsiness score.  Advisory and warning messages are presented to the driver and supplemental notifications to fleet management are also supported.  This P ...

    SBIR Phase II 2010 Department of Transportation
  2. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

      City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects.  Current assessment methods are inadequate and inefficient due to the time and resources required.  This project will develop an automated public rights-of-way assessment process a ...

    SBIR Phase II 2010 Department of Transportation
  3. Non-contact Track Gage Measurement System (NC-TGMS)

    SBC: DFUZION, INC.            Topic: 081FR4

    One of the causes of derailments occurs when the track gage is no longer compliant with the FRA track safety standards for gage measurments.  Ensuring track gage is in compliance with the FRA track safety standards is therefore of paramount importance to the FRA.  Currently, the FRA wishes to develop a non-contact track gage measurement system that overcomes the limitations of current sy ...

    SBIR Phase I 2009 Department of Transportation
  4. Traffic Intersection Simulation of IntelliDrive, J2735, and DSRC/WAVE with eTEXAS

    SBC: Harmonia Holdings Group, LLC            Topic: 101FH3

      Harmonia’s proposed work will be instrumental in accelerating the maturity of IntelliDrive applications that avoid intersection collisions.  This proposal unlocks the storehouse of modeling detail in TEXAS under the cost-free GPL copyleft license to organizations building IntelliDrive applications for collision avoidance at intersections.  We add SAE J2375 sPAT messages repo ...

    SBIR Phase I 2010 Department of Transportation
  5. Portable Active Thermographic Coating Inspection System

    SBC: Fuchs Consulting Inc            Topic: 091FH2

    This proposal seeks to produce a unique thermographic coating inspection system that is customized for the inspection of bridge coatings.  This system uses active thermography where IR sources are used to provide controlled heating to a coating system.  The presence of a defect in a coating system will result in differences in heat flow, which can be imaged with an infrared camera.  ...

    SBIR Phase I 2009 Department of Transportation
  6. Roadway Waste Heat Electricity Production Using Impoved Roadway Paving Technologies

    SBC: Planphoria LLC            Topic: 091FH5

    Planphoria will research, define and develp methods to turn our nation's roadways into a giant energy collection and transference system that produces low cost electrical energy close to point of use.  Though roadway environmental conditions change, and different roadway requirements vastly differ from the requirements of other roadways, we will determine the feasibility of this concept by le ...

    SBIR Phase I 2009 Department of Transportation
US Flag An Official Website of the United States Government