You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
  2. DETECTION AND QUANTIFICATION OF SUBSURFACE CORROSION USING IMPROVED MAGNETO-OPTIC/EDDY-CURRENT IMAGING AND IMAGE PROCESSING

    SBC: PHYSICAL RESEARCH, INC.            Topic: N/A

    NONDESTRUCTIVE INSPECTION FOR CORROSION IN ALUMINUM AIRCRAFT STRUCTURES OF AGING AIRPLANES HAS BEEN DEMONSTRATED RECENTLY USING MAGNETO-OPTIC/EDDY CURRENT IMAGING TECHNOLOGY. THIS TECHNOLOGY WAS DEVELOPED FOR RAPID INSPECTION OF SURFACE BREAKING CRACKS NEAR RIVETS IN ALUMINUM AIRCRAFT ALLOYS, BUT HAS BEEN SHOWN TO BE CAPABLE OF GENERATING IMAGES OF CORRODED REGIONS AS WELL. DEVELOPMENT OF A CORROS ...

    SBIR Phase II 1995 Department of Transportation
  3. Innovative Track Gage Measurement System

    SBC: Quest Integrated, LLC            Topic: 101FR6

    This proposal presents two innovative non-contact track gage measurement techniques, microwave and ultrasound. Both methods will be investigated and tested under harsh experimental setup conditions simulating outdoor train track. Based on the initial test results, the more promising of the proposed two techniques will be further developed into a system with optimized measurement speed and accura ...

    SBIR Phase I 2010 Department of Transportation
US Flag An Official Website of the United States Government