You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Dynamic Frequency Passive Millemeter-Wave Radiometer Based on Optical Up-Conversion
SBC: PHASE SENSITIVE INNOVATIONS INC Topic: 94Passive microwave sensors aboard satellites provide valuable information regarding weather conditions by measuring atmospheric attenuation over a broad range of frequencies from 0-200 GHz. Additional ground-based sensors are desirable to provide complementary upward looking measurements that can be used to refine existing attenuation models. Operating over such a large bandwidth, however, places ...
SBIR Phase II 2014 Department of CommerceNational Oceanic and Atmospheric Administration -
A Stereo Camera System for Measuring Coastal Currents
SBC: 3SRM INC. Topic: 84Rip currents cause multiple drowning deaths each year as swimmers are often unaware of the location and strength of coastal currents. Currently, ocean safety officials do not have an affordable and reliable commercial system which can measure coastal currents. The goal of this Phase I study is to test a stereo camera system to measure the speed, direction, and location of alongshore currents and ...
SBIR Phase I 2014 Department of CommerceNational Oceanic and Atmospheric Administration -
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: 081FH2City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...
SBIR Phase II 2010 Department of Transportation